Time: 2020
Location: Datong, Shanxi
Capacity:380kW
Project Characteristics:
The project design with DC power supply as the center, flexible access to photovoltaic, energy storage and other power sources, and at the same time for the DC charging piles and DC lighting provide DC energy, fully integrate energy control parameters and energy information, realize various forms of energy coordinated control and comprehensive energy efficiency management, and build an AC-DC hybrid microgrid with multi-point access, network sharing, and demand awareness. Improve the utilization efficiency of distributed energy, reduce energy loss, realize the organic integration of energy "supply and demand integration" and "flow" of solar power , distributed energy storage, electric vehicle and smart grid technology, and better reflect the green and low-carbon concept